Mit-ivy kev lag luam hlau Advanced Acrylic Latex Sealing Primer nrog lub zog zoo nkauj






Thov
Nws muaj cov nplaum zoo rau cov steel substrates thiab cov dej zoo sib xws, thiab cov khoom siv lub cev thiab lub cev zoo tom qab cov xim yoj dries.
5. Cov xim pleev xim muaj zoo heev kev tiv thaiv lub teeb thiab xim xim tom qab ziab.
Daim ntawv thov pom zoo Nws yog qhov tsim nyog rau kev tso kua paug ntawm cov tsheb thauj khoom, tshuab tshuab, cov khoom lag luam teeb pom kev zoo, thiab lwm yam qhov twg xav tau kev tiv thaiv siab.
Cov ntaub ntawv txheej txheem Xim Xim ntau hom
Nto qhuav (50% miscibility) 15 ℃ C <1h ; 25'C <0.5h
Khoom qhuav (50% vaum) 15'C <48h; 25 ° C <24h
Khi "kg.cm" 50
Dej (50 ± 5μm) 72h xim zaj duab xis tsis ua paug, tsis pab kom ntog, tsis xeb.
Hardness 0.3 (ob chav pendulum) cov cuab yeej khoom siv kuaj cov duab zaj duab xis tuab (23 ± 3jμm)
Adhesion (Hegelian) Qib 1
Cov kev kho mob saum npoo Lub nplauv ntawm cov khoom coated yuav tsum tsis pub dawb ntawm ya raws, roj, kua roj carbon monoxide thiab cov hmoov av.






Cov Lus Qhia Ceev
Hlau nrog rau daim tawv nqaij oxide: Tshuaj tua blasting lossis xuab zeb blasting txoj kev xws li kev ua tiav rau Sa2.5 qib, qhov twg cov xuab zeb blasting tsis tuaj yeem ua yuav tsum yog kev siv tshuab polished lossis
Raug tshuaj kho kom tshem tag nrho ntab tawg lub xub pwg.
Cov hlau tsis muaj tawv nqaij oxide: sandblasted (tua phom) rau Sa2.5 lossis huab cua tshuab txais, hluav taws xob sib tsoo cov cuab yeej rau St3.
Kev vuam, nplaim hluav taws-txiav lossis hluav taws kev txhim kho ntawm cov qhov hluav taws kub: sib tsoo rau qib St3.
Cov khoom siv tha xim nrog cov xim qub qub: tshem cov xim xoob qub thiab xeb, thiab cov xuab zeb mus rau St3 nrog cov cuab yeej huab cua lossis hluav taws xob sanding.
Cov pob tha xim niaj hnub tuaj yeem siv nrog H902 cov dej siv tshuaj pleev ib ce, lossis siv ib leeg los ua cov khoom pleev zoo nkauj sab saum toj, lossis siv nrog lwm hom khoom siv primer (xav kom raug phim rau cov ntawv pov thawj).
Construction data Table dry (50% temperature) 15'C<th;25℃C<05h Actual dry (50% humidity) 15℃C<24h;25℃<12h Density about 1.1-1.20g/cm' Theoretical coating rate 0.15-0.2kg/m' (dry film 40-50) μm)
It is recommended to apply 2 coatings, which can be applied in the way of warm touching temperature to ensure that the dry film is 40-50μm.
To be sanded and finished with sandpaper.
Construction method Air or robot spraying is possible. Mix the paint before use, adjust the viscosity according to the construction method.
Add 5-15% of water. Add water and stir evenly, then leave the surface to work without bubbles.


Construction environment 1. The brain playground should have good ventilation and dust removal facilities to ensure the quality of construction.
2. The construction should be carried out under the condition that the mixing degree is above 5℃C and the relative humidity of the environment should be <70%.
3. The substrate temperature shall be not less than 5' and shall be more than 3'C above the air dew point temperature.
washout
Vehicle Type | 100% Acrylic Latex | |
COMPOSITION (nominal) | Pigment : Lightfast Non-Lead Pigments & Mineral Extenders.
Blinder : Acrylic Emulsion. Solvent : Water. |
|
Volume Solids | 31.8% | |
Coverage per Gallon at Recommended Film Thickness | 400 –450 Sq. Ft. (37-42 m2) | |
Recommended Film Thickness
(Depending on surface texture and porosity. Be sure to estimate the right amount of paint for the job. This will ensure color uniformity and minimize the disposal of excess paint) |
Dry 1.2 mils
Wet 3.8 mils |
|
Dry Time @ 77° F (25° C) @ 50% RH
(High humidity and cool temperatures will result in longer dry, recoat and service times.) |
To Touch 1 Hour
To Recoat 2 to 4 Hours |
|
Dries By | Evaporation, Coalescence | |
Viscosity | 99 ± 2 KU | |
Gloss / Sheen | Flat (5-10 @ 85°) |
Shipping time by Sea (Just for reference) | ||||||||
North America |
11~30 days | North Africa | 20~40 days | Europe | 22~45 days | South-east Asia | 7~10 days | |
South America | 25~35 days | WestAfrica | 30~60 days | MiddleEast | 15~30 days | East Asia | 2~3 days | |
Middle America | 20~35 days | EestAfrica | 23~30 days | Ocenia | 15~20 days | South Asia | 10~25 days |



FAQ
1.About Sample
We provide free sample for testing.
2.OEM,ODM service available.
3.According to customer's request, packed with pallet or without pallet.
Tile adhesive(20kg/bag)packing with pallet specification:
64 bags/pallet = 1.28 MT/pallet
72 bags/pallet = 1.44 MT/pallet
One full 20ft container max loading 27.6MT.
With pallets can load 1360 bags, without pallet can load 1380 bags.







